2016 MCHAP
Cero K. Industrial Building
Maximillano Noguera & Alejandra Marambio
San Carlos, Chile
July 2014
PRIMARY AUTHOR
Maximiliano Noguera / Max-A
CONTRIBUTING AUTHOR
Alejandra Marambio / Max-A (Landscape architect)
CLIENT
Iansa
PHOTOGRAPHER
Erieta Attali
OBJECTIVE
The actual productive process in developing the sweetener became the core of the project resulting in a 4-story 14mt high central structure cladded in Transparent Alveolar Sunlite Polycarbonate that would pierce the main volume functioning both as an independent and cohesive element at the same time. The building looks to play on the formal purity of the Dome and the Silo, two icons of the Sugar Industry.
CONTEXT
The project is located between San Carlos and Chillan, along Chile’s Route 5 South. The fast paced project was developed in four months and built in 8 months. Iansa is the principal producer, distributor and seller of sugar in Chile. The company was looking to house the production of their new sweetener Cero K. A 30 x 50 mts two-story 8.5mt high warehouse was the starting point to house the various programmatic requirements.
PERFORMANCE